By-pass Tunnel of Lungern, Exploration Gallery
The future tunnel for driving around Lungern is 3'965 m long overall. It branches out from the existing Brünig road above the town and avoids the urban sector in a large bow under the right side of the valley. The exploration gallery makes it possible to identify in detail the geological conditions. It then serves the purpose of supplying the basic data for designing and building the main tunnel.
Main Data
- Length of tunnel: 3'210 m
- Diameter: 4.75 m
Client
Office of Public Works of the Canton of Obwalden
Consultant
IM Maggia Engineering Ltd., Locarno & IUB Engineering Services Ltd., Berne
Construction period
1999–2002
Construction costs
21 Mio. CHF
Scope of services
- Design
- Site management
- Supervision of works